PHILLIPSBURG, NJ – In Phillipsburg and Easton, PA, anticipation met reality when the Delaware River Joint Toll Bridge unveiled another night of testing of the new LED lighting on the ‘free bridge’ November 3, 2023.
The dazzling, color-changing LED architectural lighting system on the Easton-Phillipsburg ‘free bridge’ was displayed last evening, and we couldn’t resist stopping for the views. After months of tireless work and a $15,487,427.50 contract awarded to J.D. Eckman, Inc. in 2021.
You can read more here: https://www.tapinto.net/towns/phillipsburg/sections/economic-development/articles/historic-free-bridge-lights-up-phillipsburg-and-easton-pa
Photo Credit: TAPinto Phillipsburg Staff Photo | Hanisak Photography